Project Description

Aldridge recently completed a project for a new-construction supermarket in our service area. We began by sourcing and installing all needed refrigeration piping between the mechanical centers and each refrigeration circuit. Our team offloaded, set, and installed all refrigeration equipment, including mechanical centers, condensers, refrigerated cases, evaporated coils, and others. We also offloaded and installed all energy management system components.

After installing all equipment and systems, our team next performed pressure testing on all refrigeration piping and ensured all pumps were able to draw a vacuum down to sub-500 micron levels. Once testing was completed successfully, we started up all of the refrigeration and energy management systems to verify proper equipment function.

The warranty we extended to the client for this project was for any service calls placed within 90 days after the store’s grand opening.